Banner
  1. Residential
  2. Commercial
  3. Water
  4. Wastewater
  5. Drainage
  6. Drainage Districts
  7. Utility Districts
  8. Municipal Streets
  9. Highways/Roadways
  10. Structural
  11. Traffic
  12. GIS
  13. Surveying
  14. Construction Phase


  15. Project Awards
  16. 2010 CEC Engineering
  17. Excellence Gold Medal
  18. 2D Floodplain Modeling
  19.  
  20. 2009 CEC Engineering
  21. Excellence Award
  22. Fort Bend County
  23. Levee Recertifications
  24.  
  25. 2008 CEC Engineering
  26. Excellence Award
  27. Gleannloch Farms
  28.  
  29. 2007 CEC Engineering
  30. Excellence Award
  31. Summerwood Master
  32. Drainage Plan

Utility Districts

CI provides complete engineering services for municipal utility districts. We have extensive experience in feasibility studies, alternative analyses, district creation, permitting, detailed design, and construction phase services for these districts. Our District Engineering services encompass the following disciplines:

“New Districts” - CI assists the District’s attorney with the creation of the District and is responsible for preparing the District Creation Report, outlining all of the necessary improvements and their respective construction costs to determine the amount of bonds to be voted. These costs are then used to analyze the District tax rate.  CI works closely with the developer and all the District consultants to ensure a timely creation of the District and serves as the developer’s engineer on development within the District.

“Mature Districts” - Older, more mature districts may be either completely built out, with no developer activity whatsoever, or they may still have significant commercial/multi-family tract development ongoing. In this latter case, CI often acts as both the District engineer and the developer’s engineer because the developer finds it both convenient and efficient to work the District engineer.  We are experienced in balancing both roles and understand the need to act on behalf of both parties in a fair and equitable manner.

"Surface Water Conversion" - Another critical issue for Districts, no matter what their age, is surface water conversion. CI is knowledgeable with regard to plant conversions and is working on planning for surface water conversion with many of their current Districts.

Click here to view relevant project experience